南京航务工程有限公司
Nanjing Hang-Wu Waterway Engineering Co., Ltd.

An enterprise focused on waterway engineering.
Focus on work details to enhance service quality.

CHSX-HD2 section of the Changhushen Line (from the provincial boundary of Jiangsu and Zhejiang to the section along the Beijing-Hangzhou Grand Canal) lrrigation Canal

Project brief:

Project brief: The CHSX-HD2 section of the Changhushen Line (from the provincial boundary of Jiangsu and Zhejiang to the section along the Beijing-Hangzhou Grand Canal) lrrigation Canal project with a total length of 11.48 km, classified as a Grade lll canal with a canal bottom width of no less than 45 meters and a minimum canal depth of 3.2 meters. The project was awarded on June 15, 2021, officially commenced construction on October 18, 2021, and handed over on July 12, 2024. The main construction works included: revetment reinforcement works; Earthwork involving canal construction and canal works.Key construction quantities are as follows: Earthwork: 837,798 m3, Reinforced concrete for canal revetment:34,130m3 and Geomembrane 120,289 m2.


Share to:
Home            About Us         Device Display    Company construction performance        Company Construction Experience   Contact Us