南京航务工程有限公司
Nanjing Hang-Wu Waterway Engineering Co., Ltd.

An enterprise focused on waterway engineering.
Focus on work details to enhance service quality.

Waterway Construction Project of DanjingliCao River (Danyang Section) (Section ZJDJHD-4)

Project brief:

DanjingliCao River is located in the southwest of Jiangsu Province and serves as a major water transportation trunk line in the western region of Taihu Lake. It is planned as a Class Ⅲ waterway with a total length of 65.590 kilometers. For the proposed Section ZJDJHD-4, the regulated length is 5.311 kilometers. The main works of this section include the construction and warranty of above-water excavation, underwater dredging, earth backfilling, new revetment construction,existing revetment reinforcement, soft soil foundation treatment, and other related temporary projects, among which the dredging volume is 689,728 cubic meters. This project was awarded the Jiangsu Provincial Quality Project Award in 2017.


Share to:
Home            About Us         Device Display    Company construction performance        Company Construction Experience   Contact Us