Waterway Regulation Project of Yanhe River (Yangzhuang - Wuzhang River) (Section LYGYH-SG-HD1)
Project brief: Section LYGYH-SG-HD1 of the Waterway Regulation Project of Yanhe River (Yangzhuang - Wuzhang River) with a total length of newly-built revetments 17,680.387 meters, and the waterway dredging volume is 810,000 cubic meters. New revetment was constructed on both sides of the waterway, adopting the methods of bilateral widening and flatland excavation. The designed top width of the waterway is 70 meters, with the structural forms of sloped revetments and vertical retaining wall revetments. Contract Duration: 20 months Project Quality: Qualified |