CHSX-HD2 section of the Changhushen Line (from the provincial boundary of Jiangsu and Zhejiang to the section along the Beijing-Hangzhou Grand Canal) lrrigation Canal
Grade III Canal Improvement Project
Project Brief
The CHSX-HD2 section of the Changhushen Line (from the provincial boundary of Jiangsu and Zhejiang to the section along the Beijing-Hangzhou Grand Canal) lrrigation Canal project with a total length of 11.48 km, classified as a Grade lll canal with a canal bottom width of no less than 45 meters and a minimum canal depth of 3.2 meters.
The project was awarded on June 15, 2021, officially commenced construction on October 18, 2021, and handed over on July 12, 2024. The main construction works included: revetment reinforcement works; Earthwork involving canal construction and canal works.Key construction quantities are as follows: Earthwork: 837,798 m3, Reinforced concrete for canal revetment:34,130m3 and Geomembrane 120,289 m2.
Key Construction Quantities
- Earthwork: 837,798 m³
- Reinforced concrete for canal revetment: 34,130 m³
- Geomembrane: 120,289 m²
- Canal construction and improvement: 11.48 km
Project Overview
The Changhushen Line Irrigation Canal project represents a significant infrastructure development connecting the provincial boundary of Jiangsu and Zhejiang to the Beijing-Hangzhou Grand Canal. This strategic waterway serves multiple purposes, including irrigation, flood control, and navigation, making it a vital component of the regional water management system.
The project was executed over a nearly three-year period, from June 2021 to July 2024, demonstrating our company's commitment to delivering high-quality infrastructure projects within scheduled timeframes. The comprehensive improvement works have significantly enhanced the canal's capacity, durability, and operational efficiency.
Construction Achievements
- Successfully completed the comprehensive improvement of 11.48 km of Grade III canal
- Ensured canal dimensions meet the required 45-meter bottom width
- Maintained minimum canal depth of 3.2 meters throughout the project length
- Implemented extensive revetment reinforcement works to prevent erosion
- Executed large-scale earthwork operations with precision and efficiency
- Applied high-quality geomembrane for effective seepage control
- Delivered the project on schedule after nearly three years of construction