Waterway Construction of DanjingliCao River (Danyang Section) Waterway Regulation Project (Section ZJDJHD-1)
Project Brief: Section ZJDJHD-1 is constructed in accordance with the Class Ⅲ navigation standard. The regulation scope is from chainage 5K+137 to 9K+137, with a total regulated length of 4 kilometers. The main works of this section include the construction and warranty of above-water excavation, underwater dredging (275,000 cubic meters), earth backfilling, new revetment construction, existing revetment reinforcement, soft soil foundation treatment, and other related temporary projects. Contract Duration: 18 months Project Quality: Qualified Award: Jiangsu Provincial Quality Project Award (2017) |